Ireland – Roof-covering work – EMERGENCY WORKS SCHEME REPLACEMENT OF ACM SLATES
Tender description
The project comprises the replacement of existing asbestos-containing material (ACM) roof slates at Herbertstown National School, Herbertstown, Kilmallock, Co. Limerick, V35 KX63, under the Department of Education's Emergency Works Scheme, together with all associated and ancillary works. The scope of works shall include, but shall not be limited to, the following, as detailed in the Pricing Schedule of Works and accompanying tender documentation: 1. Replacement of ACM Slates: Provision and installation of new roof slates, including all associated roofing materials, components, fixings and ancillary works necessary to complete the roof replacement. 2. Removal and Disposal of ACM Slates: Safe removal, handling, transportation and disposal of the existing asbestos-containing roof slates at an appropriately authorised waste facility, in accordance with all applicable statutory requirements and health and safety regulations. The works shall also include all necessary scaffolding, temporary works, protection of the existing school building, site safety measures, making good and associated works required for the proper and complete execution of the project.
Eligibility criteria
The full eligibility and assessment pack is released with the tender documents.
Get the full tender details
The contracting authority, budget, contact details and document pack are shared with the organisations we support on this opportunity. Tell us you are interested and we will come back within one business day.
- Contracting authority
- Contact information
Similar open tenders
(1917) Te Wharekura o Rākaumangamanga #262010 Block P: Gym Refurbishment
10414239
15107 - Lyttelton to Timaru Corridor Strategic Transport Plan - PS
Bidding for this one?
The team behind this board writes the response, shapes the evidence and keeps the submission moving. Read the workstream that fits before the closing date does.
Want help winning one of these?
We write the response, shape the evidence and keep the submission moving — from a single workstream to the whole bid.