ActiveProfessional services

Y1DZ--598-22-115 Site Utility Infrastructure-NLR

Deadline: 16 Nov 2026, 23:59 12 days left United States · Nationwide (federal) Published on SAM.gov Contract Opportunities Added 27 Oct 2026

Tender description

This procurement will be issued as a 100% Set-Aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) through RFP procedures under FAR 15. The Central Arkansas Veterans Healthcare System (CAVHS) has a requirement Upgrade/Replace Site Utility Infrastructure, Project #598-22-115. The tentative date for issuing the RFP is on or around November 17, 2026, with proposals due approximately 49 calendar days later on or around January 05, 2027. There will be no public bid opening. The period of performance is 720 calendar days after issuance of the Notice to Proceed. Location of the work is at the Eugene J. Towbin (EJT) VA Healthcare Center, 2200 Fort Roots Drive, North Little Rock, AR 72114. The point of contact for this notice is Contract Specialist, Julius Jones at Julius.Jones@va.gov.Telephone requests will NOT be accepted. Abbreviated Scope of Work: The scope of this project includes upgrading the water source, storage, and site distribution system at the North Little Rock (NLR) Veterans Affairs Medical Center (VAMC) campus: All work shall be done is a manner and sequence to minimize impact to the campus, patients, visitors and staff. No prolonged outages are permitted and any activity affecting the campus shall be coordinated in advance. See additional sections for detailed information. The NLR campus is short of reserve water capacity. This project includes a new elevated water storage tank. The new tank installation shall include all labor and materials required for a complete and operational system including, but not limited to, supporting structure, piping, appurtenances, and accessories as required. The existing elevated 250,000-gallon water tower shall be demolished in its entirety including all below grade supporting structure, piping vaults, etc. The demolition shall be in strict accordance with the phasing schedule. A new pump house with new pumps and new pump controls is included in this project. Physical and operational security, monitoring, contr

Eligibility criteria

The full eligibility and assessment pack is released with the tender documents.

Get the full tender details

The contracting authority, budget, contact details and document pack are shared with the organisations we support on this opportunity. Tell us you are interested and we will come back within one business day.

  • Contracting authority
  • Contact information
Next step

Bidding for this one?

The team behind this board writes the response, shapes the evidence and keeps the submission moving. Read the workstream that fits before the closing date does.

Want help winning one of these?

We write the response, shape the evidence and keep the submission moving — from a single workstream to the whole bid.

See how we work